TCS Pune

Watchdog Configuration and Recovery

Production firmware practical

Watchdog Configuration and Recovery

Configure watchdog coverage so a stalled critical path resets safely and records a useful cause.

Arduino-compatible frameworks, ESP-IDF/FreeRTOS, PIC/AVR/STM32/RP-class systems; apply exact vendor documentation for the selected MCU.

Architecture

Task health votes → watchdog supervisor → hardware watchdog; reset reason retained for next boot.

Security and recovery risks

  • Do not feed from an unconditional timer ISR.nDo not permanently disable watchdog to hide a fault.nAvoid reset loops with bounded recovery/fallback.

Implementation procedure

  1. List critical tasks and maximum healthy interval.nChoose watchdog timeout above proven worst-case latency.nFeed only after all required health votes.nInject a controlled deadlock.nVerify reset reason, safe outputs and recovery count.

Starter code / configuration

if (all_critical_tasks_healthy()) { feed_hardware_watchdog(); }

Verification evidence

TestExpectedEvidence
Nominal bootCorrect version and hardware revision reportedCaptured boot log
Fault recoveryDefined safe state and reset reasonFault-injection record
Power cycleNo corrupt configuration or unsafe outputRepeated-cycle log

Required release artifacts

  • Versioned firmware binary and SHA-256
  • Source revision / build identifier
  • Board and hardware-revision compatibility list
  • Test report and known limitations
  • Recovery image and factory-reset procedure
  • Provisioning/calibration schema
  • Release approval record
Local browser tools

Firmware production workbench

State-machine builder

Deep-sleep battery estimate

Firmware release manifest

Provisioning & calibration record

Manufacturing self-test

A/B update exercise

OTA and automatic rollback simulator

Advance one validated stage at a time. A failed boot test returns the device to the previous slot.

Slot Av1.0.0Confirmed
Slot BEmptyInactive
  1. Running confirmed firmware from Slot A.
Release gate

Production-readiness checklist

A downloadable release decision is generated only after every mandatory control is confirmed.

0/12 checks complete.
Ready when you are

Need help with your laptop or computer?

Send us the model and fault details. Start your repair request online or contact TCS Pune directly.

WA